Client: Stolt-Nielsen
Client: Stolt-Nielsen

Client: Stolt-Neilsen
Service Type(s):
Marine Construction On Terminal Docks
Project Name:
Stolt-Neilsen Terminal Docks 3 and 4 Construction
Project Location:
Braithwaite, LA
Description:
River Construction constructed Stolt-Neilsen Terminals’ Docks 3 and 4 to meet
demand and enhance customer experience at one of its bulk liquid and gas storage services on
the lower Mississippi River. The project involved installation of 36 owner-supplied timber pilings,
provision and installation of 30” and 36” steel pipe pilings, construction and installation of
transitional piperack and pipeway, roadway and walkway structures, setting owner-supplied
materials, and all landside concrete work. River Construction worked in partnership with the
Stolt Comex, Stolt-Neilsen’s general contracting arm, to accomplish this job.